Bank of Industry Conference 2012 – Case Study

Summary

Three day event at this beautiful central London venue. Following a trial event at G Live in Guildford, we moved the full production to the grand ballroom at this universally known and loved venue. The event ran over the opening three days of the Olympics, which brought it’s own challenges including the ladies cycling sprint along Park Lane on the same day as load in! With a full daytime programme and one evening gala dinner, there was plenty to keep us busy. Our client BCUK asked us to supply full event production, which we did with our usual style and professionalism. This included:

  • Custom stage set, graphics and gobos
  • Audio
  • Video & cameras
  • Lighting
  • Rigging & trussing
  • Set furnishing
  • All crew and logistics