John Deere Summer 2016 Celebrations – Case Study

Summary

Celebrating 50 years in the UK and Ireland, John Deere hosted a programme of entertainment, product launch and staff training events throughout September and October. We provided full production within a 35m x 55m marquee, sited at the company’s headquarters in Langar, Nottinghamshire. The marquee included main stage with Chauvet PVP-5 LED panel screen and Electro-Voice XLE line array, operated by OneBigStar engineers during presentations and live band performances. Further installations included LiteDeck staging configured as bleachers-style seating, a shop constructed of Tension Fabric System graphic walls and further TFS graphic displays flown and ground-stacked throughout.

Check out our production kit in action on Vimeo